Works are in the final stages now at the mill, with the client furniture being delivered to site tomorrow. The past few weeks have been very trying from a weather perspective as we have had long periods of solid rain that have made landscaping next to impossible, but Gregor has persevered, and how the solid surface paving outside the garage, granite chip pathways, and remainder of final drainage bits have been installed.

Internally, the Lighting has been completed, wood burning stove installed and the worktop for the island was installed finally this week, after a minor mishap in transportation from the manufacturers to the site resulted in it having to be remade. The wheel has been removed and then reinstalled after needing one or two tweaks to get it to run perfectly and the timber cladding applied to central drum. These shots are from the last few weeks and I am due to do a site visit this Friday, which I am thoroughly looking forward to as Gregor is fairly complete with the landscaping and at present is mid way through undertaking the final fencing works to the boundaries and tackling the visibility splays at the junction with the main road. The client has commenced packing ready for an imminent move and we are looking forward to getting them ensconced into their new home in plenty of time for Christmas.
0 comments:
Post a Comment
Note: only a member of this blog may post a comment.