Monday, 4 January 2010

Little Maldron Mill Client has moved in


Well, 2009 was a long and very interesting year culminating with four projects largely complete in December. Our clients at the Mill have moved in and are busy adjusting to having a house full of entirely new things right down to cups and crockery, as most of their belongings went up in smoke whilst they were in storage in 2007.
Initial feedback has been very positive, and other than having been slightly hampered by nearly a foot of snow just at the moment, it looks at though the two spaces are going to work out very well and allow our client a great deal of flexibility about how they live and work in the two buildings.

The kitchen island unit is working particularly well, with enough space to comfortably have 4 people congregate to eat, as we found out tonight when we went over to join the client for supper.
The dining room table is on its way, due in next week, along with a final few bits of furniture. The mill wheel does not appear to be freezing despite enduring temperatures last week of -9deg C, and the water in the lade is flowing well and shows no signs of freezing much to every ones relief. The final few snags should be completed this month.

0 comments:

Post a Comment

Note: only a member of this blog may post a comment.