Saturday, 11 February 2012

North Croft Auchronie Progress 2


Works continue at a pace at North croft Auchronie, and a considerable amount of progress has been made on site in the past fortnight by the main contractor, Total Build Scotland. The steel framework had been completed, along with the timber infill panels, the roof trusses have been installed and covered with sarking and a breather membrane, plus the scaffold has been erected around the building. The block work garage now also has a roof, the welsh slates are on site and orders have been placed for the windows, feature helical staircase, huge roof light over the main entrance, and the biomass boiler system.
Internally the sub floor has been cast and the internal partition framework is in the process of being installed, along with pipework for the plumbing and the first fix electrics.
The weather has so far been very kind as unusually for this time of year, we are yet to have significant snowfall. it has been cold, but luckily not cold enough to impede any of the concrete works and slow down the build as a result. Total Build report that the project should complete a month ahead of schedule. Kevin McLeod eat your heart out! So far, so good!

0 comments:

Post a Comment

Note: only a member of this blog may post a comment.